![]() ![]() Computerized animation of the East Link alignment from Seattle to Redmond at 60% design (March 2014).Aerial footage of the East Link alignment in Bellevue (May 2020).View a comparison of aerial footage captured in May 2020 of the East Link alignment in Bellevue with the animation of the light rail created in 2014 when the project was designed to 60 percent. This segment includes the Judkins Park Station (in Seattle) and the Mercer Island Station (in Mercer Island).Īpproximately five miles of light rail trackway are being built in Bellevue. I-90/Seattle-Mercer Island Segment: From International District/Chinatown Station to the East end of the East Channel Bridge.This segment includes the Overlake Village Station and the Redmond Technology Center Station. SR 520/Overlake Segment: Northeast 20th Street to Northeast 40th Street at Overlake Transit Center (in Redmond).The following segment includes stations outside of Bellevue city limits: This segment includes the BelRed/130th Station and a 300-stall park-and-ride lot. BelRed Segment: 124th Avenue Northeast to the intersection of Northeast 20th Street and 136th Avenue Northeast.This segment includes the East Main Station, Bellevue Downtown Station, Wilburton Station and the Spring District/120th Station. ![]() Work began spring 2017 with all major construction completed in the third quarter of 2022. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |